SaierNico is always committed to helping shipowners reduce carbon emissions for their operating ships, one of the effective ways is by using our AMP system when ship berthing at port.
Till end of November 2024, SaierNico successfully finished the installation and commissioning of AMP system for 27 operation ships, both by at sea and in dry docking shipyard, following list for reference.
No | Type of ship | Ship name |
1 | 1,900TEU Container Vessel | ZHONG GU DONG HAI |
2 | 1,900TEU Container Vessel | ZHONG GU NAN HAI |
3 | 1,900TEU Container Vessel | ZHONG GU HUANG HAI |
4 | 6,589TEU Container Vessel | YM MUTUALITY |
5 | 6,589TEU Container Vessel | YM MOBILITY |
6 | 6,750TEU Container Vessel | MSC LUDOVICA |
7 | 5,900TEU Container Vessel | C.C. BAIKAL |
8 | 4,400TEU Container Vessel | C.C. NANTONG |
9 | 2,600TEU Container Vessel | C.C. MANAUS |
10 | 13,200TEU Container Vessel | OOCL KOREA |
11 | 13,200TEU Container Vessel | OOCL SINGAPORE |
12 | 8,888TEU Container Vessel | OOCL TAIPEI |
13 | 8,063TEU Container Vessel | OOCL HAMBURG |
14 | 4,578TEU Container Vessel | OOCL NAGOYA |
15 | 4,578TEU Container Vessel | OOCL NEW ZEALAND |
16 | 4,578TEU Container Vessel | OOCL BRISBANE |
17 | 2,800TEU Container Vessel | ADONIS |
18 | 2,800TEU Container Vessel | ACASTOS |
19 | 2,100CEU PCTC | SHI HAI |
20 | 2,100CEU PCTC | SHI JIANG |
21 | 2,100CEU PCTC | SHI YANG |
22 | Cruise Ship | BLUE DREAM MELODY |
23 | Cruise Ship | MEDITERRANEA |
24 | 57,000DWT BULK CARRIER | MING ZHOU 62 |
25 | 57,000DWT BULK CARRIER | MING ZHOU 57 |
26 | Cement Carrier | AKUNA |
27 | Cement Carrier | WYUNA |
This year 2024, we also have a big step for AMP retrofit is that we have finished several turn-key retrofit projects which are during the ship’s sailing at sea, benefits is in this way it will not affect shipowner’s normal cargo operation.
Below two projects installed with SaierNico AMP system which retrofit at sea and already delivered to shipowner for reference, some more AMP turn-key projects the retrofit work still in progress at sea or in dry docking shipyard (both in China and in Europe).
Ship ADONIS, a 2,800TEUs container ship, direct voyage from Shanghai to Los Angeles, completing the journey in just 13 days.
SaierNico provide a turn-key solution for this project, AMP power capacity is 6.6kV 4500kVA. All equipment as well installation materials delivered on board the ship on June 27th,2024. Installation and commissioning finished in one journey only 13days and successfully connected to shop power at Los Angles on July 12th,2024.


Ship C.C. NANTONG, a 4,400TEUs container ship, which service connects China, Korea, Malaysia, Singapore and Hong Kong.
SaierNico provides turn-key solution for this project as well, AMP power capacity is 6.6kV 4500kVA. All equipment as well installation materials delivered on board the ship on August 7th,2024. Installation and commissioning finished on August 31st,2024 and connected shore power at SHEKOU port on the same day.